KC Streetcar Riverfront Extension

Opened to the public in May of 2026, just in time for the highly anticipated World Cup, this project was a significant addition for downtown Kansas City.

It serves as the first ever streetcar route to the Berkeley Riverfront — unlike other streetcar lines across the city, which were rebuilt on existing routes that were originally constructed in the late 1800’s.

Grand Boulevard Pedestrian Bridge

Completed in May of 2026, just ahead of the highly anticipated World Cup, the Grand Boulevard bridge offers pedestrians a safe route from the River Market to the Riverfront.

This project was unique in that it runs parallel and in close proximity to our streetcar extension project. The implementation of this bridge was a significant economic driver for the development of Berkeley Riverfront, as it provides increased access to the already popular and continually expanding district.

Grant Avenue Parkway, Design-Build

For this project, we partnered with CFS Engineers to deliver upgrades to Grant Avenue Parkway for the City of Springfield.

It involved transforming the corridor from a three-lane roadway to a two-lane facility, with a 10-foot multi-use pathway and a five-foot sidewalk. Additionally, all overhead utilities were relocated into an underground duct bank system, and a roundabout was incorporated to improve traffic management.

NW Waukomis Drive Street Upgrade

This project delivered multiple improvements along NW Waukomis Drive — spanning Englewood to NW 62nd Street.

It entailed widened roadways, reimagined intersections, curbs and gutters, new streetlights, dedicated bike lanes, a 10-foot-wide recreational path, and sidewalks connecting neighborhoods to the local elementary school.

75th & Wornall Interchange Improvements

The 75th Street Reconstruction Project was completed in the Waldo neighborhood, and entailed numerous improvements.

The project scope included reconstructed roadway, parking lot modifications, pedestrian accommodations, a water main replacement, an extension of the Trolley Track Trail, as well as a new sidewalk, LED streetlights, and interconnected signals.

Route 13 Bridge Replacement, Henry County

The Route 13 Project involved the reconstruction of two southbound bridges above Truman Lake, north of Deepwater, that had deteriorated significantly since their formation in 1964.

The new bridges have greatly enhanced the safety and capacity of drivers along this high-traffic section of Route 13 that carries approximately 16,000 vehicles daily. The total length of the project was 3.7 miles. It entailed demolition, site work, paving, and new bridge construction.

KCI Corridor Trail, Various Segments

The KCI Corridor Project entailed the construction of a 10-foot-wide multi-use trail with a retaining wall, fencing, and new landscaping.

Spanning the NE side of I-29, the aim of this path is to enhance accessibility in the Northland by connecting pathways and improving safety for bikers and pedestrians.

435 South Loop Link, Design-Build

This project included multiple bridge replacements, resurfacing, and corridor safety/mobility improvement from the Kansas state line to the Three Trails Crossing interchange.

The improvements include replacing the bridges at Wornall and Holmes, rehabilitating the bridges
at 104th Street and the Blue River, and adding another lane to I-435. Additional improvements include removing the loop ramps at the Holmes Road interchange, 12-foot inside shoulders along I-435, increased vertical clearance under the Wornall Road bridge, a taller and safer concrete barrier wall, and longer merge lanes in critical locations. The project also included more than a half mile of pedestrian facilities spanning three arterial intersections, as well as both open and closed drainage design throughout the entire project corridor.